DEVELOPMENT PLAN

Layout Particulars :

Breakwater Southern b/w : 1800 m                          
  Northern spur : 100 m
Rockbund      2150 m
Approach Channel    Outer channel : 200m wide; (-) 16.2m deep;  4335m long
  Inner channel :  200m wide; (-) 15.4m deep;  1040m long
Turning Circle       550m diameter; 15.4m draft
Berth Requirements Dry bulk berths – 3
Multipurpose berths  - 3
Container berths – 3
LNG jetty – 1
Dredging  Rock – 0.39 million cum
Sand – 1.17 million cum
Reclamation   16.67 million cum
Draft 17 meters.

Proposed Connectivity

Railway :
Konkan Railway at a distance of 10 kms is proposed to connect to the Port.  We are already in discussion with the Railway Authorities to take it forward.

Road :
Proposed 4 lanes coastal road connects Redi Port directly to the state Highway.  The Plans are in advance stage.

Master Plan and DPR prepared by L&T Ramboll.

Proposed Plan
 